Font Size Small Medium Large
Weather
Hot Hot
High: 104°F
Low: 68°F
5 Day Forecast

Inspection Letter Sample

DATE

 

 

 

 

City of Mesquite

10 E. Mesquite Blvd.

Mesquite, NV  89027

 

RE:       PROJECT NAME

 

ATTN:   Allen Bell, City Engineer

              Bill Tanner, Public Works Director

 

We, (Engineering Firm Name) being the Civil Engineering Firm for said project, along with (Soils Testing Firm Name), and (Developer Name) hereby acknowledge that the inspecting engineer and material testing firm have been hired directly by said developer, to perform the inspections on (Project Name).

 

We further acknowledge that all reports, test results and other items relating to the construction and progress of the project are to be delivered to the City first and foremost.  These reports may be delivered to the contractor and the developer simultaneously, however, the City, in all cases is to be considered the client for purposes of reporting.

 

Sincerely,

 

 

 

____________________

Engineering Company

 

 

____________________

Testing Company

 

 

___________________

 

City of Mesquite 10 E. Mesquite Blvd., Mesquite, NV 89027 | 702-346-5295 | Contact Us
©2007 City of Mesquite | Privacy, Security, Acceptable Use policies