Font Size Small Medium Large
Weather is currently unavailable.

City Departments

Engineering

The City Engineer provides:

Development, Site, Street and Drainage Plan Review and Approval

Sample Format for Plans

Standard Specifications & Drawings guidelines

Design and Construction Standards for Wastewater Collection Systems - 1997

Quality Control Program Manual for Contractor, Source and Production

Map Review and Approval

Landscaping Plan To be included in the Improvement Plans

Sample Format for Maps

Plan approval requires bonding of a project

Forms used in bonding a project

Flood Plan Administration

Drainage Review

Hydrologic Design Manual

Elevation Certificates Information

Flood Control Information

Assists Capital Projects Department and Other Departments with:

Engineering and Management oversight of the Capital Projects.

Administration and Supervisory Oversight of

Engineering Consultant Contracts

News: Mesquite Residents should be aware of flooding and flood insurance issues
Flood Safety Awareness during Summer Months
Spotlights: Proposed Replacement GA Airport Draft EIS
Flood Insurance

Contact Information
Allen Bell
10 East Mesquite Blvd.
Mesquite, NV 89027
702-346-5295
702-346-2795 (fax)
abell@mesquitenv.gov
 
Hours:

Monday - Thursday 
7:30 a.m. to 5:30 p.m.

Friday 
7:30 a.m. to 11:30 a.m.
(City Hall is closed on Friday afternoon)

 

Related Links

City of Mesquite 10 E. Mesquite Blvd., Mesquite, NV 89027 | 702-346-5295 | Contact Us
©2009 City of Mesquite | Privacy, Security, Acceptable Use policies